Progress Reports
September 2011 Progress Report
August 2011 Progress Report
Pawtuxet Fish Passage Presentation
Application to Alter (Full text)
Appendix A
ARRA Funding Description
Appendix B
Ciba Geigy Sediment Sampling Report
Kleinschmidt Assoc. Feasibility Study
Milone & MacBroom Restoration Alternatives Report
NOAA Wetlands Assessment
Technical Memorandum National Register Eligibility Evaluation
Appendix C
Deed Evaluation and Abutter Information
Appendix D
January 29,2009 Permitting Strategy Memorandum
Appendix E
Field Forms
Appendix F
HEC-RAS Model
Appendix G
Shear Stress Data
Appendix H
Sediment Sampling and Grain-Size Analyses Results
Appendix I
Public Access Survey
Appendix J
Engineering Drawings
Appendix K
NRCS Design Standards
Appendix L
Rhodes on the Pawtuxet Letter of Authorization
Appendix M
State/ Federal Historic Preservation Agreement
Figures
Pawtuxet River Restoration Alternatives Assessment (Milone &
MacBroom, Inc., 2008)
Sections
1 through 4
Sections
5 through 6
Milone & MacBroom Appendices
Appendix A
Existing
Conditions Survey
Appendix B
Results
of Sediment Sampling
Appendix C
NOAA
Wetlands Report
Appendix D
Hydrology
Calculations
Appendix E
Tide
Gauge Data
Appendix F
FEMA
Model
Appendix G
Effective
Duplicate Model
Appendix H
FEMA
Revised Effective Duplicate Model
Appendix I
Existing
Conditions Model
Appendix J
Technical
Memorandum; National Register Eligibility Evaluation Criteria
Appendix K
Full
Dam Removal Proposed Conditions Model
Appendix L
Controlled
Breach Proposed Conditions Model
Appendix M
Rock
Ramp Proposed Conditions Model
Appendix N
Sediment
Stability Analysis
Appendix O
Comparison
of Existing and Proposed Channel Widths
Appendix P
Engineer's
Opinion of Probable Construction Costs
|